DR Anderson completed an addition to the University of Nebraska Medical Center’s Central Utility Plant. The project was completed during the “off season” for campus cooling. An existing structure housing a chiller and high voltage campus electrical distribution gear was removed. Temporary structures were built around he chiller and distribution gear as they remained in place while the new addition was completed around them.

DR Anderson successfully completed this facility for Metropolitan Community College as a link to bring their existing facilities together with a new public library and transportation facility. This building also serves as a student center with public meeting areas and numerous classrooms.

Continuing our relationship with PCS, DR Anderson was selected as General Contractor for PCS’ Weeping Water Mine Maintenance Facility. DRA has previously completed PCS’ Raymond Mill installation, Safe Haven project, Load-out Addition, Quality Control Lab Remodel, and Administration Office Remodel.

The Maintenance facility includes offices for the Mine Foreman as well as conference room, lockers, and a break room for the miners. The maintenance area includes extra thick floors and large overhead doors for servicing off-road haul-trucks and other mine equipment.

DR Anderson was selected as general contractor for another project at PCS’ Weeping water facility. DRA had previously completed PCS’ Raymond Mill installation as well as the Safe Haven project where DRA constructed multiple storm shelters meeting FEMA disaster requirements.

DR Anderson constructed two new public Compressed Natural Gas (CNG) filling stations and completed upgrades to MUD’s private existing fleet fueling facility. The public filling stations are a first for the Omaha Metro area and when constructed were the only public fueling stations between Chicago and Denver along the I-80 corridor.

DR Anderson constructed this building adjacent to the existing IBEW offices and meeting hall. This required careful coordination between DR Anderson’s management team and our client, IBEW. This project was successfully completed in phases without any major interruptions or delays in our clients daily operations.

D.R. Anderson (DRA) was hired to add on to each end of an existing material storage crane way and build a new 80 x 420 foot building over truck and rail entrances. All work was to be completed without interrupting plant operations.

DR Anderson performed General Construction work on this Data Center in Council Bluffs, IA. The facility houses servers and equipment for one of the world’s largest internet companies. Work was completed on a fast track GMP basis.

DR Anderson constructed this multi-user jail facility on a tight jobsite without interrupting the operations of the County Courthouse and Sheriff's Office. Once completed the facility integrated the City Police, County Sheriff and County Jail into one facility.

D.R. Anderson (DRA) successfully negotiated this design build project with Ash Grove and Studio 360 Architects. DRA was selected for this project based on our qualifications and fee for this cost-plus GMP project delivery.

DRA and Studio 360 worked together to establish the project budget while meeting the client’s needs for a first class office in the heart of their existing plant. The project features extensive use of Ash Grove Cement in the precast walls, exposed concrete floors, and concrete roof decks.